Worldwide wastewater treatment observatory · Belgium

Aguas SB Observatory · public data to understand water

WWTP LA GUEULE AVAL

Belgium · official identifier BERW6308803

22,275h-e design capacity (2022) · 112th of 397

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BERW6308803 · reported size 22,275 h-e design capacity · received load 12,649 h-e · reported treatment: PS · data year 2022. 112th of 397 records with reported size in the inventory of Belgium; 0.21 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.5 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

22,275h-e design capacity
12,649h-e received load (2022)
57 %reported load/capacity ratio (not hydraulic utilisation)
112th of 397by reported size among the 397 records with a size in the inventory · 0.21 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.7458, 5.9604 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

710,709reference kWh per year for this load
56.2kWh per h-e (average load) per year
106,606€ per year at 0.15 €/kWh
39 %share of energy used for aeration

what this estimate is · Inputs: 12,649 p.e. of reported load; equivalent average load 12,639 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (4,541 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Lontzen7.2 km4,7003,202primary and secondary
Aubel9.4 km7,2002,581primary and secondary
Welkenraedt · Berw630840210.5 km9,5006,432primary and secondary
Aix-Sud (D)13.9 km2,3001,435primary and secondary
Membach14.8 km25,41613,478primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP LA GUEULE AVAL report?

Reported size: 22,275 h-e design capacity. Received load: 12,649 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of LA GUEULE AVAL?

Aguas SB simulator reference scenario for 12,649 p.e. of reported load: 710,709 kWh per year (56.2 kWh per p.e. of average load), with aeration as 39 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.