Worldwide wastewater treatment observatory · Belgium

Aguas SB Observatory · public data to understand water

WWTP Liedekerke

Belgium · official identifier BE_F_TP_174

85,500h-e design capacity (2022) · 24th of 397

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BE_F_TP_174 · reported size 85,500 h-e design capacity · received load 78,600 h-e · reported treatment: PST · data year 2022. 24th of 397 records with reported size in the inventory of Belgium; 0.80 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

85,500h-e design capacity
78,600h-e received load (2022)
92 %reported load/capacity ratio (not hydraulic utilisation)
24th of 397by reported size among the 397 records with a size in the inventory · 0.80 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.8887, 4.0903 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,469,770reference kWh per year for this load
44.2kWh per h-e (average load) per year
520,466€ per year at 0.15 €/kWh
46 %share of energy used for aeration

what this estimate is · Inputs: 78,600 p.e. of reported load; equivalent average load 78,537 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

10.3estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (28,217 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ninove6.6 km31,50035,200primary, secondary and tertiary
Aalst9.3 km90,00078,600primary, secondary and tertiary
Asse - Bollebeek10.3 km7,2003,600primary, secondary and tertiary
Bambrugge11.8 km16,20013,600primary, secondary and tertiary
Merchtem13.2 km16,2009,300primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Liedekerke report?

Reported size: 85,500 h-e design capacity. Received load: 78,600 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Liedekerke?

Aguas SB simulator reference scenario for 78,600 p.e. of reported load: 3,469,770 kWh per year (44.2 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.