WWTP OBOURG
Belgium · official identifier BERW5305302
5,500h-e design capacity (2022) · 286th of 397
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BERW5305302 · reported size 5,500 h-e design capacity · received load 2,705 h-e · reported treatment: PS · data year 2022. 286th of 397 records with reported size in the inventory of Belgium; 0.05 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.7 km · 14 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.4722, 4.0052 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Belgium
Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,705 p.e. of reported load; equivalent average load 2,703 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (971 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Havre · Berw5305301 | 2.7 km | 6,000 | 2,147 | primary and secondary |
| Casteau · Berw_cs_05044 | 4.0 km | not reported | not reported | not reported |
| Casteau · Berw5504003 | 4.2 km | 2,700 | not reported | not reported |
| Spiennes - Saint-Symphorien | 4.8 km | 4,000 | 3,125 | primary and secondary |
| Boussoit | 5.6 km | 19,000 | 14,891 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP OBOURG report?
Reported size: 5,500 h-e design capacity. Received load: 2,705 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of OBOURG?
Aguas SB simulator reference scenario for 2,705 p.e. of reported load: 147,138 kWh per year (54.4 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.