Worldwide wastewater treatment observatory · Belgium

Aguas SB Observatory · public data to understand water

WWTP Stekene

Belgium · official identifier BE_F_TP_132

18,000h-e design capacity (2022) · 136th of 397 (tied with 7 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BE_F_TP_132 · reported size 18,000 h-e design capacity · received load 14,100 h-e · reported treatment: PST · data year 2022. 136th of 397 records with reported size in the inventory of Belgium (tied with 7 others); 0.17 % of the sum of those 397 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

18,000h-e design capacity
14,100h-e received load (2022)
78 %reported load/capacity ratio (not hydraulic utilisation)
136th of 397by reported size among the 397 records with a size in the inventory (tied with 7 others) · 0.17 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates51.1979, 4.0381 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Belgium

Regulatory framework of Belgium · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

790,052reference kWh per year for this load
56.1kWh per h-e (average load) per year
118,508€ per year at 0.15 €/kWh
39 %share of energy used for aeration

what this estimate is · Inputs: 14,100 p.e. of reported load; equivalent average load 14,089 p.e. with the reference profile of Belgium (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.8estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (5,062 m³/day of reference), not measured or available for reclamation.

LOCATION

Belgium: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Sinaai4.1 km13,0506,100primary, secondary and tertiary
Sint-Niklaas6.4 km45,00050,200primary, secondary and tertiary
De Klinge6.7 km4,5003,900primary, secondary and tertiary
Moerbeke6.9 km18,00012,200primary, secondary and tertiary
Lokeren11.4 km48,60042,300primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Stekene report?

Reported size: 18,000 h-e design capacity. Received load: 14,100 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Stekene?

Aguas SB simulator reference scenario for 14,100 p.e. of reported load: 790,052 kWh per year (56.1 kWh per p.e. of average load), with aeration as 39 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.