Worldwide wastewater treatment observatory · Brazil

Aguas SB Observatory · public data to understand water

WWTP ETE ENGENHEIRO COELHO

The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): Supplement S1.3 distinguishes the 2017 atlas from its 2013 WWTP records. Display both where data vintage matters.

Brazil · official identifier HW:42163

14,000reported population served (people) (2013) · 719th of 2,820 (tied with 1 others)

HydroWASTE v1.0 / Brazil · official identifier HW:42163 · reported size 14,000 reported population served (people) · reported treatment: Secondary · data year 2013. 719th of 2,820 records with reported size in the inventory of Brazil (tied with 1 others); 0.02 % of the sum of those 2,820 records in people served (sum of records, not national capacity); nearest inventoried plant at 19.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data scientific inventory · 2013

14,000reported population served (people)
719th of 2,820by reported size among the 2,820 records with a size in the inventory (tied with 1 others) · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentSecondary · reported levels
Reported coordinates-22.4700, -47.2030 position validation in the source: medium what it means
Source and yearHydroWASTE v1.0 / Brazil · dataset record

REGULATORY REFERENCES

Referencia normativa: Brazil

Regulatory framework of Brazil. Individual applicability is not determined in this profile.

LOCATION

Brazil: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistancereported population served (people)Treatment
ETE ARARAS SP19.5 km81,173Secondary
ETE TATU22.8 km220,230Primary
ETE MOGI MIRIM24.1 km62,104Secondary
ETE LOPES25.2 km2,936Secondary
ETE AV BRASIL27.0 km79,889Secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ETE ENGENHEIRO COELHO report?

Reported size: 14,000 reported population served (people). Units are retained without conversion.

What treatment is reported?

Treatment Secondary. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · HydroWASTE v1.0 / Brazil · data 2013 · edition 2017 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.