Worldwide wastewater treatment observatory · Brazil
Aguas SB Observatory · public data to understand water
WWTP ETE PARQUE NOVO MUNDO
The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): Supplement S1.3 distinguishes the 2017 atlas from its 2013 WWTP records. Display both where data vintage matters.
Brazil · official identifier HW:42515
1,479,337reported population served (people) (2013) · 4th of 2,820
HydroWASTE v1.0 / Brazil · official identifier HW:42515 · reported size 1,479,337 reported population served (people) · reported treatment: Secondary · data year 2013. 4th of 2,820 records with reported size in the inventory of Brazil; 2.1 % of the sum of those 2,820 records in people served (sum of records, not national capacity); nearest inventoried plant at 8.7 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data scientific inventory · 2013
| Treatment | Secondary · reported levels |
|---|---|
| Reported coordinates | -23.5150, -46.5590 position validation in the source: medium what it means |
| Source and year | HydroWASTE v1.0 / Brazil · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2024-03-27 · An addendum to the tender to expand the Parque Novo Mundo wastewater treatment plant in São Paulo was published. São Paulo State Official Gazette
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Brazil
Regulatory framework of Brazil. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | reported population served (people) | Treatment |
|---|---|---|---|
| ETE VARzEA DO PALACIO | 8.7 km | 86,579 | Secondary |
| ETE SAO JOAO GUARULHOS | 15.5 km | 86,579 | Secondary |
| ETE MAUA | 17.4 km | 382,530 | Advanced |
| ETE BONSUCESSO GUARULHOS | 18.4 km | 115,438 | Secondary |
| ETE SEDE MAIRIPORA | 22.4 km | 15,035 | Secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ETE PARQUE NOVO MUNDO report?
Reported size: 1,479,337 reported population served (people). Units are retained without conversion.
What treatment is reported?
Treatment Secondary. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · HydroWASTE v1.0 / Brazil · data 2013 · edition 2017 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.