Worldwide wastewater treatment observatory · Brazil

Aguas SB Observatory · public data to understand water

WWTP ETE SANTA ADeLIA

The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): Supplement S1.3 distinguishes the 2017 atlas from its 2013 WWTP records. Display both where data vintage matters.

Brazil · official identifier HW:42473

13,950reported population served (people) (2013) · 724th of 2,820

HydroWASTE v1.0 / Brazil · official identifier HW:42473 · reported size 13,950 reported population served (people) · reported treatment: Secondary · data year 2013. 724th of 2,820 records with reported size in the inventory of Brazil; 0.02 % of the sum of those 2,820 records in people served (sum of records, not national capacity); nearest inventoried plant at 10.5 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data scientific inventory · 2013

13,950reported population served (people)
724th of 2,820by reported size among the 2,820 records with a size in the inventory · 0.02 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentSecondary · reported levels
Reported coordinates-21.2590, -48.7950 position validation in the source: medium what it means
Source and yearHydroWASTE v1.0 / Brazil · dataset record

REGULATORY REFERENCES

Referencia normativa: Brazil

Regulatory framework of Brazil. Individual applicability is not determined in this profile.

LOCATION

Brazil: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistancereported population served (people)Treatment
ETE FERNANDO PRESTES10.5 km4,643Secondary
ETE PINDORAMA16.0 km14,818Secondary
ETE CANDIDO RODRIGUES18.8 km2,165Secondary
ETE PALMARES PAULISTA20.7 km9,631Secondary
ETE VISTA ALEGRE DO ALTO21.0 km6,706Secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ETE SANTA ADeLIA report?

Reported size: 13,950 reported population served (people). Units are retained without conversion.

What treatment is reported?

Treatment Secondary. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · HydroWASTE v1.0 / Brazil · data 2013 · edition 2017 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.