Worldwide wastewater treatment observatory · Brazil

Aguas SB Observatory · public data to understand water

WWTP ETE SAO JOSe DO BARREIRO

The year refers to the inventory or source; it does not establish an individual observation date or current operation. Source note (original text): Supplement S1.3 distinguishes the 2017 atlas from its 2013 WWTP records. Display both where data vintage matters.

Brazil · official identifier HW:42503

2,802reported population served (people) (2013) · 1764th of 2,820

HydroWASTE v1.0 / Brazil · official identifier HW:42503 · reported size 2,802 reported population served (people) · reported treatment: Secondary · data year 2013. 1764th of 2,820 records with reported size in the inventory of Brazil; < 0.01 % of the sum of those 2,820 records in people served (sum of records, not national capacity); nearest inventoried plant at 13.1 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data scientific inventory · 2013

2,802reported population served (people)
1764th of 2,820by reported size among the 2,820 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
TreatmentSecondary · reported levels
Reported coordinates-22.6330, -44.5680 position validation in the source: medium what it means
Source and yearHydroWASTE v1.0 / Brazil · dataset record

REGULATORY REFERENCES

Referencia normativa: Brazil

Regulatory framework of Brazil. Individual applicability is not determined in this profile.

LOCATION

Brazil: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistancereported population served (people)Treatment
ETE ARAPEI13.1 km1,471Secondary
ETE CONTORNO18.5 km5,482Advanced
ETE ALEGRIA RESENDE19.6 km20,507Secondary
ETE AMAN23.1 km15,523Secondary
ETE MONET23.5 km2,346Secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP ETE SAO JOSe DO BARREIRO report?

Reported size: 2,802 reported population served (people). Units are retained without conversion.

What treatment is reported?

Treatment Secondary. Nitrogen, phosphorus and UV are shown only when explicitly reported.

SOURCE AND CORRECTIONS

Source

reported data · HydroWASTE v1.0 / Brazil · data 2013 · edition 2017 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.