Worldwide wastewater treatment observatory · Bulgaria
Aguas SB Observatory · public data to understand water
WWTP Kanalizacia Batanovtsi
Bulgaria · official identifier BGCO72223_00_01
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BGCO72223_00_01 · reported size not reported h-e design capacity · received load 2,367 h-e · data year 2022. nearest inventoried plant at 0.1 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 42.6006, 22.9552 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Bulgaria
Regulatory framework of Bulgaria. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,367 p.e. of reported load; equivalent average load 1,775 p.e. with the reference profile of Bulgaria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (710 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Uwwtp Batanovtsi-Pernik | 0.1 km | 194,000 | 18,399 | primary, secondary and tertiary |
| Uwwtp Radomir | 7.8 km | 29,000 | 5,443 | primary, secondary and tertiary |
| Kanalizacia Breznik | 14.9 km | not reported | not reported | not reported |
| Kanalizacia Bobov Dol | 26.8 km | not reported | not reported | not reported |
| Kanalizacia Bozhurishte | 26.9 km | not reported | not reported | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Kanalizacia Batanovtsi report?
Reported size: not reported h-e design capacity. Received load: 2,367 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Kanalizacia Batanovtsi?
Aguas SB simulator reference scenario for 2,367 p.e. of reported load: 102,606 kWh per year (57.8 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.