Worldwide wastewater treatment observatory · Bulgaria

Aguas SB Observatory · public data to understand water

WWTP UWWTP Burgas

Bulgaria · official identifier BGWT07079_00_01

397,745h-e design capacity (2022) · 4th of 124

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BGWT07079_00_01 · reported size 397,745 h-e design capacity · received load 146,866 h-e · reported treatment: PST · data year 2022. 4th of 124 records with reported size in the inventory of Bulgaria; 4.6 % of the sum of those 124 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

397,745h-e design capacity
146,866h-e received load (2022)
37 %reported load/capacity ratio (not hydraulic utilisation)
4th of 124by reported size among the 124 records with a size in the inventory · 4.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionyes
Statusactive
Reported coordinates42.5147, 27.4157 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Other published data

Mean annual volume treated reported in the 2022 cycle13,524,486 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Bulgaria

Regulatory framework of Bulgaria · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

4,719,042reference kWh per year for this load
42.8kWh per h-e (average load) per year
707,856€ per year at 0.15 €/kWh
44 %share of energy used for aeration

what this estimate is · Inputs: 146,866 p.e. of reported load; equivalent average load 110,150 p.e. with the reference profile of Bulgaria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

16.1estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (44,060 m³/day of reference), not measured or available for reclamation.

LOCATION

Bulgaria: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Uwwtp Gorno Ezerovo (Burgas)4.8 km3,1601,398primary, secondary and tertiary
Uwwtp Kv.Meden Rudnik - Burgas7.6 km48,90016,014primary, secondary and tertiary
Kanalizacia Burgas9.6 kmnot reportednot reportednot reported
Uwwtp Banevo-Vetren-Mineralni Bani (Burgas)10.2 km16,7876,114primary, secondary and tertiary
Kanalizacia Kameno11.9 kmnot reportednot reportednot reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UWWTP Burgas report?

Reported size: 397,745 h-e design capacity. Received load: 146,866 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UWWTP Burgas?

Aguas SB simulator reference scenario for 146,866 p.e. of reported load: 4,719,042 kWh per year (42.8 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.