Worldwide wastewater treatment observatory · Bulgaria
Aguas SB Observatory · public data to understand water
WWTP UWWTP General Toshevo
Bulgaria · official identifier BGWT14711_00_01
7,631h-e design capacity (2022) · 107th of 124
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BGWT14711_00_01 · reported size 7,631 h-e design capacity · received load 862 h-e · reported treatment: PS · data year 2022. 107th of 124 records with reported size in the inventory of Bulgaria; 0.09 % of the sum of those 124 records in h-e (sum of records, not national capacity); nearest inventoried plant at 23.5 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 43.7058, 28.0540 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Bulgaria
Regulatory framework of Bulgaria · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 862 p.e. of reported load; equivalent average load 648 p.e. with the reference profile of Bulgaria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (259 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Uwwtp Dobrich | 23.5 km | 112,000 | 46,335 | primary, secondary and tertiary |
| Uwwtp Balchik | 35.5 km | 22,200 | 8,790 | primary, secondary and tertiary |
| Uwwtp K.K.Albena | 38.9 km | 19,000 | 18,965 | primary, secondary and tertiary |
| Uwwtp Kavarna | 41.9 km | 3,583 | 4,070 | primary, secondary and tertiary |
| Uwwtp Shabla | 43.8 km | 360 | 176 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP UWWTP General Toshevo report?
Reported size: 7,631 h-e design capacity. Received load: 862 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of UWWTP General Toshevo?
Aguas SB simulator reference scenario for 862 p.e. of reported load: 44,357 kWh per year (68.5 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.