Bulgaria · official identifier BGWT56722_00_01
130,000h-e design capacity (2022) · 14th of 124
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier BGWT56722_00_01 · reported size 130,000 h-e design capacity · received load 59,795 h-e · reported treatment: PST · data year 2022. 14th of 124 records with reported size in the inventory of Bulgaria; 1.5 % of the sum of those 124 records in h-e (sum of records, not national capacity); nearest inventoried plant at 15.4 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | yes |
| Status | active |
| Reported coordinates | 43.5047, 24.5784 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
FUENTES PÚBLICAS
What public sources report
Documented milestones
- 2022-06-02 · The Pleven wastewater treatment plant reopened in June 2022 after its water and sludge lines were refurbished. Bulgarian Ministry of Environment and Water
Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.
REGULATORY REFERENCES
Referencia normativa: Bulgaria
Regulatory framework of Bulgaria · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 59,795 p.e. of reported load; equivalent average load 44,848 p.e. with the reference profile of Bulgaria (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (17,939 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Kanalizacia Iskar | 26.3 km | not reported | not reported | not reported |
| Kanalizacia Nikopol | 34.6 km | not reported | not reported | not reported |
| Uwwtp Knezha | 38.3 km | 10,500 | 2,341 | primary, secondary and tertiary |
| Uwwtp Lovech | 39.1 km | 85,700 | 35,675 | primary, secondary and tertiary |
| Kanalizacia Letnitsa | 44.0 km | not reported | not reported | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP UWWTP Pleven report?
Reported size: 130,000 h-e design capacity. Received load: 59,795 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of UWWTP Pleven?
Aguas SB simulator reference scenario for 59,795 p.e. of reported load: 2,307,783 kWh per year (51.5 kWh per p.e. of average load), with aeration as 44 % of consumption. Estimate with the country reference profile; not a measurement of the plant.