Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Banjole-Bumbište
Croatia · official identifier HRUWWTP_0001001_001
7,000h-e design capacity (2022) · 85th of 115 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0001001_001 · reported size 7,000 h-e design capacity · received load 5,658 h-e · reported treatment: P · data year 2022. 85th of 115 records with reported size in the inventory of Croatia (tied with 3 others); 0.16 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.6 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 44.8179, 13.8543 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 5,658 p.e. of reported load; equivalent average load 5,660 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,132 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pula Centar-Valkane | 4.6 km | 35,000 | 72,862 | primary |
| Premantura | 4.6 km | 8,400 | 4,145 | primary |
| Medulin-Marlera | 8.8 km | 34,500 | 9,630 | primary |
| Pula Sjever-Peroj | 16.5 km | 14,000 | 31,415 | primary |
| Rovinj-Kuvi | 32.4 km | 64,900 | 56,627 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Banjole-Bumbište report?
Reported size: 7,000 h-e design capacity. Received load: 5,658 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Banjole-Bumbište?
Aguas SB simulator reference scenario for 5,658 p.e. of reported load: 258,473 kWh per year (45.7 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.