Worldwide wastewater treatment observatory · Croatia

Aguas SB Observatory · public data to understand water

WWTP Cres-Kimen

Croatia · official identifier HRUWWTP_0001017_001

9,928h-e design capacity (2022) · 65th of 115

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0001017_001 · reported size 9,928 h-e design capacity · received load 11,507 h-e · reported treatment: P · data year 2022. 65th of 115 records with reported size in the inventory of Croatia; 0.23 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 14.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

9,928h-e design capacity
11,507h-e received load (2022)
116 %reported load/capacity ratio (not hydraulic utilisation)
65th of 115by reported size among the 115 records with a size in the inventory · 0.23 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimario (as reported to the EEA: P) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates44.9583, 14.3995 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

507,647reference kWh per year for this load
44.1kWh per h-e (average load) per year
76,147€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 11,507 p.e. of reported load; equivalent average load 11,505 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.8estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (2,301 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Krk14.2 km20,80013,950primary
Martinšćica17.4 kmnot reported3,780not reported
Punat18.7 km19,20010,632primary
Rabac23.1 kmnot reported11,737not reported
Malinska-Njivice23.5 km45,00021,013primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Cres-Kimen report?

Reported size: 9,928 h-e design capacity. Received load: 11,507 h-e. Units are retained without conversion.

What treatment is reported?

Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Cres-Kimen?

Aguas SB simulator reference scenario for 11,507 p.e. of reported load: 507,647 kWh per year (44.1 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.