Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Đakovo
Croatia · official identifier HRUWWTP_0006020_001
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0006020_001 · reported size not reported h-e design capacity · received load 24,820 h-e · data year 2022. nearest inventoried plant at 11.3 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.3146, 18.4044 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 24,820 p.e. of reported load; equivalent average load 24,820 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,964 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Ivankovo | 22.7 km | 8,000 | 1,000 | primary and secondary |
| Cerna | 27.6 km | 6,000 | 43 | primary and secondary |
| Gradište | 30.6 km | not reported | 1,087 | not reported |
| Našice | 31.5 km | 15,000 | 13,610 | primary, secondary and tertiary |
| Vinkovci-Jošine | 32.1 km | 43,000 | 34,591 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Đakovo report?
Reported size: not reported h-e design capacity. Received load: 24,820 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Đakovo?
Aguas SB simulator reference scenario for 24,820 p.e. of reported load: 1,082,089 kWh per year (43.6 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.