Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Karlovac-Duga Resa
Croatia · official identifier HRUWWTP_0004040_001
98,500h-e design capacity (2022) · 7th of 115
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0004040_001 · reported size 98,500 h-e design capacity · received load 45,602 h-e · reported treatment: PST · data year 2022. 7th of 115 records with reported size in the inventory of Croatia; 2.3 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.7 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.4907, 15.5869 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 45,602 p.e. of reported load; equivalent average load 45,600 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (9,120 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Jastrebarsko | 17.9 km | 14,965 | 9,527 | primary, secondary and tertiary |
| Donja Zdenčina | 24.6 km | not reported | 852 | not reported |
| Samobor | 35.2 km | not reported | 25,210 | not reported |
| Ogulin | 37.6 km | 7,500 | 3,615 | primary, secondary and tertiary |
| Glina | 41.5 km | not reported | 7,528 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Karlovac-Duga Resa report?
Reported size: 98,500 h-e design capacity. Received load: 45,602 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Karlovac-Duga Resa?
Aguas SB simulator reference scenario for 45,602 p.e. of reported load: 1,822,231 kWh per year (40.0 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.