Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Lipik Pakrac-Dobrovac
Croatia · official identifier HRUWWTP_0006047_001
13,500h-e design capacity (2022) · 58th of 115
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0006047_001 · reported size 13,500 h-e design capacity · received load 9,482 h-e · reported treatment: P · data year 2022. 58th of 115 records with reported size in the inventory of Croatia; 0.31 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 14.2 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.4164, 17.1266 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 9,482 p.e. of reported load; equivalent average load 9,480 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,896 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Novska | 14.2 km | not reported | 6,964 | not reported |
| Lipovljani | 18.5 km | not reported | 1,642 | not reported |
| Daruvar | 20.3 km | 23,000 | 12,843 | primary and secondary |
| Garešnica | 22.2 km | 7,000 | 3,849 | primary and secondary |
| Nova Gradiška | 27.2 km | 22,100 | 20,146 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Lipik Pakrac-Dobrovac report?
Reported size: 13,500 h-e design capacity. Received load: 9,482 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Lipik Pakrac-Dobrovac?
Aguas SB simulator reference scenario for 9,482 p.e. of reported load: 420,773 kWh per year (44.4 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.