Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Požega
Croatia · official identifier HRUWWTP_0006064_001
33,500h-e design capacity (2022) · 26th of 115
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0006064_001 · reported size 33,500 h-e design capacity · received load 20,363 h-e · reported treatment: P · data year 2022. 26th of 115 records with reported size in the inventory of Croatia; 0.77 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 7.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primario (as reported to the EEA: P) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.3363, 17.7101 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 20,363 p.e. of reported load; equivalent average load 20,365 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,073 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Pleternica | 7.4 km | not reported | 6,777 | not reported |
| Velika | 13.4 km | not reported | 1,299 | not reported |
| Kutjevo | 16.1 km | not reported | 2,031 | not reported |
| Staro Petrovo Selo | 18.6 km | not reported | 505 | not reported |
| Orahovica | 26.5 km | not reported | 4,431 | not reported |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Požega report?
Reported size: 33,500 h-e design capacity. Received load: 20,363 h-e. Units are retained without conversion.
What treatment is reported?
Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Požega?
Aguas SB simulator reference scenario for 20,363 p.e. of reported load: 891,566 kWh per year (43.8 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.