Worldwide wastewater treatment observatory · Croatia

Aguas SB Observatory · public data to understand water

WWTP Slatina

Croatia · official identifier HRUWWTP_0005123_001

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0005123_001 · reported size not reported h-e design capacity · received load 9,234 h-e · data year 2022. nearest inventoried plant at 18.6 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
9,234h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates45.7144, 17.6993 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

410,491reference kWh per year for this load
44.4kWh per h-e (average load) per year
61,574€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 9,234 p.e. of reported load; equivalent average load 9,235 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (1,847 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Suhopolje18.6 km9,9001,490primary and secondary
Orahovica24.3 kmnot reported4,431not reported
Virovitica27.8 km26,00023,684primary, secondary and tertiary
Velika30.0 kmnot reported1,299not reported
Sušine-Đurđenovac33.8 kmnot reported2,201not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Slatina report?

Reported size: not reported h-e design capacity. Received load: 9,234 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Slatina?

Aguas SB simulator reference scenario for 9,234 p.e. of reported load: 410,491 kWh per year (44.4 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.