WWTP Split-Solin-Stupe

Croatia · official identifier HRUWWTP_0001131_001

135,000h-e design capacity (2022) · 4th of 115

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0001131_001 · reported size 135,000 h-e design capacity · received load 168,294 h-e · reported treatment: P · data year 2022. 4th of 115 records with reported size in the inventory of Croatia; 3.1 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 11.8 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

135,000h-e design capacity
168,294h-e received load (2022)
125 %reported load/capacity ratio (not hydraulic utilisation)
4th of 115by reported size among the 115 records with a size in the inventory · 3.1 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimario (as reported to the EEA: P) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.5194, 16.5250 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,206,906reference kWh per year for this load
30.9kWh per h-e (average load) per year
781,036€ per year at 0.15 €/kWh
59 %share of energy used for aeration

what this estimate is · Inputs: 168,294 p.e. of reported load; equivalent average load 168,295 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

12.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (33,659 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Sutivan15.3 km2,0002,211primary
Supetar15.4 kmnot reported6,890not reported
Omiš15.6 km32,21011,933primary
Postira18.1 kmnot reported4,296not reported
Kaštela-Trogir-Divulje18.5 km40,00029,523primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Split-Solin-Stupe report?

Reported size: 135,000 h-e design capacity. Received load: 168,294 h-e. Units are retained without conversion.

What treatment is reported?

Treatment P. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Split-Solin-Stupe?

Aguas SB simulator reference scenario for 168,294 p.e. of reported load: 5,206,906 kWh per year (30.9 kWh per p.e. of average load), with aeration as 59 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.