WWTP Sveti Ivan Zelina

Croatia · official identifier HRUWWTP_0004075_001

not reportedh-e design capacity (2022)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0004075_001 · reported size not reported h-e design capacity · received load 3,221 h-e · data year 2022. nearest inventoried plant at 4.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

not reportedh-e design capacity
3,221h-e received load (2022)
not reportedsin tamaño declarado · the largest plants in the country
Treatmentnot reported
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates45.9366, 16.2419 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

153,244reference kWh per year for this load
47.6kWh per h-e (average load) per year
22,987€ per year at 0.15 €/kWh
71 %share of energy used for aeration

what this estimate is · Inputs: 3,221 p.e. of reported load; equivalent average load 3,220 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.2estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (644 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Vrbovec13.3 kmnot reported9,674not reported
Brckovljani-Božjakovina13.7 km8,4001,474primary and secondary
Zagreb20.3 km1,200,000819,761primary and secondary
Zlatar21.2 kmnot reported3,926not reported
Rugvica22.8 km25,00015,464primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Sveti Ivan Zelina report?

Reported size: not reported h-e design capacity. Received load: 3,221 h-e. Units are retained without conversion.

What treatment is reported?

Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Sveti Ivan Zelina?

Aguas SB simulator reference scenario for 3,221 p.e. of reported load: 153,244 kWh per year (47.6 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.