Worldwide wastewater treatment observatory · Croatia
Aguas SB Observatory · public data to understand water
WWTP Ugljan
Croatia · official identifier HRUWWTP_0001155_001
not reportedh-e design capacity (2022)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0001155_001 · reported size not reported h-e design capacity · received load 935 h-e · data year 2022. nearest inventoried plant at 7.4 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | not reported |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 44.1327, 15.0936 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 935 p.e. of reported load; equivalent average load 935 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (187 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Preko | 7.4 km | not reported | 1,696 | not reported |
| Kali | 12.0 km | not reported | 463 | not reported |
| Zadar-Centar | 13.4 km | 100,000 | 59,633 | primary and secondary |
| Nin | 14.3 km | not reported | 1,800 | not reported |
| Bibinje-Sukošan | 17.9 km | 20,180 | 5,383 | primary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Ugljan report?
Reported size: not reported h-e design capacity. Received load: 935 h-e. Units are retained without conversion.
What treatment is reported?
Treatment not reported. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Ugljan?
Aguas SB simulator reference scenario for 935 p.e. of reported load: 49,165 kWh per year (52.6 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.