Worldwide wastewater treatment observatory · Croatia

Aguas SB Observatory · public data to understand water

WWTP Varaždin

Croatia · official identifier HRUWWTP_0005035_001

140,000h-e design capacity (2022) · 3rd of 115

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0005035_001 · reported size 140,000 h-e design capacity · received load 101,795 h-e · reported treatment: PS · data year 2022. 3rd of 115 records with reported size in the inventory of Croatia; 3.2 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.0 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

140,000h-e design capacity
101,795h-e received load (2022)
73 %reported load/capacity ratio (not hydraulic utilisation)
3rd of 115by reported size among the 115 records with a size in the inventory · 3.2 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates46.3098, 16.3964 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025-05-06 · On 6 May 2025, the City of Varaždin reported that the first phase of rebuilding and expanding the Motičnjak treatment plant was underway. City of Varaždin

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L06; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,461,096reference kWh per year for this load
34.0kWh per h-e (average load) per year
519,164€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 101,795 p.e. of reported load; equivalent average load 101,795 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

7.4estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (20,359 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Novo Selo Na Dravi3.0 km5,0002,936primary and secondary
Čakovec9.4 km75,00054,337primary, secondary and tertiary
Podbrest9.7 kmnot reported4,098not reported
Varaždinske Toplice11.6 km6,5004,633primary and secondary
Novi Marof16.5 kmnot reported2,105not reported

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Varaždin report?

Reported size: 140,000 h-e design capacity. Received load: 101,795 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Varaždin?

Aguas SB simulator reference scenario for 101,795 p.e. of reported load: 3,461,096 kWh per year (34.0 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.