Worldwide wastewater treatment observatory · Croatia

Aguas SB Observatory · public data to understand water

WWTP Velika Gorica

Croatia · official identifier HRUWWTP_0004010_001

35,000h-e design capacity (2022) · 23rd of 115 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0004010_001 · reported size 35,000 h-e design capacity · received load 45,776 h-e · reported treatment: PS · data year 2022. 23rd of 115 records with reported size in the inventory of Croatia (tied with 1 others); 0.80 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 8.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

35,000h-e design capacity
45,776h-e received load (2022)
131 %reported load/capacity ratio (not hydraulic utilisation)
23rd of 115by reported size among the 115 records with a size in the inventory (tied with 1 others) · 0.80 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates45.7156, 16.0925 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Croatia

Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,827,827reference kWh per year for this load
39.9kWh per h-e (average load) per year
274,174€ per year at 0.15 €/kWh
56 %share of energy used for aeration

what this estimate is · Inputs: 45,776 p.e. of reported load; equivalent average load 45,775 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

3.3estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (9,155 m³/day of reference), not measured or available for reclamation.

LOCATION

Croatia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Zagreb8.6 km1,200,000819,761primary and secondary
Rugvica10.6 km25,00015,464primary and secondary
Brckovljani-Božjakovina19.9 km8,4001,474primary and secondary
Ivanić Grad23.7 km20,00011,729primary
Zaprešić25.5 km61,00034,818primary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Velika Gorica report?

Reported size: 35,000 h-e design capacity. Received load: 45,776 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Velika Gorica?

Aguas SB simulator reference scenario for 45,776 p.e. of reported load: 1,827,827 kWh per year (39.9 kWh per p.e. of average load), with aeration as 56 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.