WWTP Vrsar-Petalon
Croatia · official identifier HRUWWTP_0001169_001
22,500h-e design capacity (2022) · 41st of 115
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier HRUWWTP_0001169_001 · reported size 22,500 h-e design capacity · received load 21,276 h-e · reported treatment: PST · data year 2022. 41st of 115 records with reported size in the inventory of Croatia; 0.52 % of the sum of those 115 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.6 km · 2 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 45.1409, 13.5979 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Croatia
Regulatory framework of Croatia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 21,276 p.e. of reported load; equivalent average load 21,275 p.e. with the reference profile of Croatia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (4,255 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Poreč Jug-Debeli Rt | 6.6 km | 48,000 | 35,459 | primary, secondary and tertiary |
| Rovinj-Kuvi | 8.8 km | 64,900 | 56,627 | primary |
| Poreč-Sjever | 12.0 km | 37,000 | 28,679 | primary, secondary and tertiary |
| Lanterna | 17.1 km | 30,000 | 20,695 | primary, secondary and tertiary |
| Kanfanar | 18.5 km | 1,900 | 2,205 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Vrsar-Petalon report?
Reported size: 22,500 h-e design capacity. Received load: 21,276 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Vrsar-Petalon?
Aguas SB simulator reference scenario for 21,276 p.e. of reported load: 930,549 kWh per year (43.7 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.