World wastewater treatment plant observatory · data as reported by each inventory

Wastewater treatment plants in Cyprus

← Back to the map

24 inventory records · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública)

Data years: 2022. The inventory date does not establish current operation.

24 results

CompareNameNative sizeYear
LimassolCY51_UWWTP272,000 population equivalent (p.e.)2022
Mia Milia BCY11_6_UWWTP269,117 population equivalent (p.e.)2022
Vathia-Gonia-ACY11_5_UWWTP201,667 population equivalent (p.e.)2022
PaphosCY61_UWWTP150,000 population equivalent (p.e.)2022
Anthoupolis-BCY11_4_UWWTP130,000 population equivalent (p.e.)2022
ParalimniCY31_UWWTPP114,583 population equivalent (p.e.)2022
LarnacaCY41_UWWTP100,000 population equivalent (p.e.)2022
Ayia NapaCY31_UWWTPA93,750 population equivalent (p.e.)2022
Central Vathia GoniaCY11_3_UWWTP45,765 population equivalent (p.e.)2022
AstromeritisCY102_UWWTP14,767 population equivalent (p.e.)2022
AthienouCY407_UWWTP8,983 population equivalent (p.e.)2022
AgrosCY503_UWWTP5,250 population equivalent (p.e.)2022
KyperoundaCY501_UWWTP3,500 population equivalent (p.e.)2022
PlatresCY502_UWWTP3,500 population equivalent (p.e.)2022
LythrodontasCY104_UWWTP3,500 population equivalent (p.e.)2022
PelendriCY504_UWWTP3,000 population equivalent (p.e.)2022
KakopetriaCY110_UWWTP2,200 population equivalent (p.e.)2022
Livadhia Refugee CampCY406_UWWTP2,000 population equivalent (p.e.)2022
AchnaCY305_UWWTPNot reported population equivalent (p.e.)2022
AradippouCY402_UWWTPNot reported population equivalent (p.e.)2022
EpiskopiCY507_UWWTPNot reported population equivalent (p.e.)2022
Limassol WestCY52_UWWTPNot reported population equivalent (p.e.)2022
PolisCY601_UWWTPNot reported population equivalent (p.e.)2022
SoleaCY110_1_UWWTPNot reported population equivalent (p.e.)2022

Regulatory context

EU framework; national review pending. This is not an exhaustive review of applicable law.

European Union: urban wastewater treatment

Directive (EU) 2024/3019 sets phased requirements. Inventory design capacity is not the legally defined load and cannot by itself determine a facility's deadline.

  • Relevant load and agglomeration size, not just design capacity.
  • Receiving area, risk assessment, national transposition and individual permit.
  • Articles 7 and 8: tertiary and quaternary treatment; 150,000 p.e. is a load threshold, not a rule automatically applied to map design capacity.

References reviewed: 2026-11-06. Individual applicability: undetermined. This profile does not establish authorization or compliance.