Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Batelov
Czechia · official identifier CZ6105-601144-00285595-4/1U
1,970h-e design capacity (2022) · 579th of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ6105-601144-00285595-4/1U · reported size 1,970 h-e design capacity · received load 1,310 h-e · reported treatment: PS · data year 2022. 579th of 607 records with reported size in the inventory of Czechia; 0.01 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.3142, 15.4054 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,310 p.e. of reported load; equivalent average load 1,316 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (312 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Trest | 5.6 km | 6,700 | 3,999 | primary and secondary |
| Cov Pocatky | 14.1 km | 5,000 | 1,729 | primary, secondary and tertiary |
| Cov Studena | 16.1 km | 5,200 | 4,030 | primary, secondary and tertiary |
| Cov Telc | 16.3 km | 8,000 | 5,580 | primary and secondary |
| Cov Zirovnice | 18.2 km | 8,340 | 9,291 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Batelov report?
Reported size: 1,970 h-e design capacity. Received load: 1,310 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Batelov?
Aguas SB simulator reference scenario for 1,310 p.e. of reported load: 71,665 kWh per year (54.5 kWh per p.e. of average load), with aeration as 65 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.