Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Bystrany
Czechia · official identifier CZ4213-616702-49099469-4/1U
104,185h-e design capacity (2022) · 22nd of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ4213-616702-49099469-4/1U · reported size 104,185 h-e design capacity · received load 81,182 h-e · reported treatment: PS · data year 2022. 22nd of 607 records with reported size in the inventory of Czechia; 0.70 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.8 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.6236, 13.8691 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 81,182 p.e. of reported load; equivalent average load 81,470 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (19,321 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Zelenky | 6.8 km | 17,700 | 18,451 | primary and secondary |
| Cov Bilina | 8.8 km | 19,292 | 19,214 | primary and secondary |
| Cov Chlumec U Chabarovic | 9.6 km | 4,267 | 1,944 | primary and secondary |
| Cov Loucna U Lomu | 14.8 km | 800 | 820 | primary and secondary |
| Cov Lom U Mostu | 15.3 km | 1,958 | 2,685 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Bystrany report?
Reported size: 104,185 h-e design capacity. Received load: 81,182 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Bystrany?
Aguas SB simulator reference scenario for 81,182 p.e. of reported load: 3,155,964 kWh per year (38.7 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.