Worldwide wastewater treatment observatory · Czechia

Aguas SB Observatory · public data to understand water

WWTP COV Hodkovice nad Mohelkou

Czechia · official identifier CZ5105-640344-49099469-4/1U

1,840h-e design capacity (2022) · 583rd of 607

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ5105-640344-49099469-4/1U · reported size 1,840 h-e design capacity · received load 1,090 h-e · reported treatment: PS · data year 2022. 583rd of 607 records with reported size in the inventory of Czechia; 0.01 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 4.3 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

1,840h-e design capacity
1,090h-e received load (2022)
59 %reported load/capacity ratio (not hydraulic utilisation)
583rd of 607by reported size among the 607 records with a size in the inventory · 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.6617, 15.0956 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Czechia

Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

60,362reference kWh per year for this load
55.3kWh per h-e (average load) per year
9,054€ per year at 0.15 €/kWh
64 %share of energy used for aeration

what this estimate is · Inputs: 1,090 p.e. of reported load; equivalent average load 1,092 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.1estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (259 m³/day of reference), not measured or available for reclamation.

LOCATION

Czechia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Rychnov U Jablonce Nad Nisou4.3 km4,4001,632primary and secondary
Cov Cesky Dub - Nova7.4 km2,0502,103primary and secondary
Vk Jablonec Nad Nisou - Kokonin8.5 kmnot reportednot reportednot reported
Cov Turnov9.8 km20,00018,596primary and secondary
Cov Zelezny Brod10.7 km7,5662,707primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Hodkovice nad Mohelkou report?

Reported size: 1,840 h-e design capacity. Received load: 1,090 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Hodkovice nad Mohelkou?

Aguas SB simulator reference scenario for 1,090 p.e. of reported load: 60,362 kWh per year (55.3 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.