Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Hodonin
Czechia · official identifier CZ6206-640417-49454544-4/1U
90,000h-e design capacity (2022) · 31st of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ6206-640417-49454544-4/1U · reported size 90,000 h-e design capacity · received load 45,621 h-e · reported treatment: PS · data year 2022. 31st of 607 records with reported size in the inventory of Czechia; 0.60 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.6 km · 8 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.8414, 17.1152 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 45,621 p.e. of reported load; equivalent average load 45,785 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (10,858 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Mikulcice | 5.6 km | 3,500 | 1,141 | primary and secondary |
| Cov Dolni Bojanovice | 6.0 km | 3,150 | 3,148 | primary and secondary |
| Cov II Moravska Nova Ves | 7.8 km | 1,000 | 1,523 | primary and secondary |
| Cov Dubnany | 8.3 km | 6,500 | 3,052 | primary and secondary |
| Cov Mutenice | 8.4 km | 4,175 | 3,357 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Hodonin report?
Reported size: 90,000 h-e design capacity. Received load: 45,621 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Hodonin?
Aguas SB simulator reference scenario for 45,621 p.e. of reported load: 1,991,730 kWh per year (43.5 kWh per p.e. of average load), with aeration as 54 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.