WWTP COV Loucany
Czechia · official identifier CZ7107-686921-00635651-4/1U
2,930h-e design capacity (2022) · 498th of 607 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ7107-686921-00635651-4/1U · reported size 2,930 h-e design capacity · received load 2,042 h-e · reported treatment: PS · data year 2022. 498th of 607 records with reported size in the inventory of Czechia (tied with 1 others); 0.02 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.5 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.6008, 17.0913 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,042 p.e. of reported load; equivalent average load 2,049 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (486 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Lutin | 6.5 km | 6,200 | 2,465 | primary and secondary |
| Cov Horka Nad Moravou | 9.8 km | 4,400 | 2,652 | primary and secondary |
| Cov Kostelec Na Hane | 9.8 km | 3,500 | 2,227 | primary, secondary and tertiary |
| Cov Litovel | 11.5 km | 40,083 | 33,191 | primary and secondary |
| Cov Olomouc | 13.1 km | 259,500 | 219,044 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Loucany report?
Reported size: 2,930 h-e design capacity. Received load: 2,042 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Loucany?
Aguas SB simulator reference scenario for 2,042 p.e. of reported load: 107,833 kWh per year (52.6 kWh per p.e. of average load), with aeration as 67 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.