Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Semily
Czechia · official identifier CZ5107-747271-00276111-4/1U
13,333h-e design capacity (2022) · 173rd of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ5107-747271-00276111-4/1U · reported size 13,333 h-e design capacity · received load 7,989 h-e · reported treatment: PS · data year 2022. 173rd of 607 records with reported size in the inventory of Czechia; 0.09 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 5.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.6147, 15.3160 precision reported by the source: level 1 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,989 p.e. of reported load; equivalent average load 8,016 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,901 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Zelezny Brod | 5.9 km | 7,566 | 2,707 | primary and secondary |
| Cov Velke Hamry | 10.9 km | 2,300 | 2,060 | primary and secondary |
| Cov Lomnice Nad Popelkou | 11.1 km | 5,500 | 5,400 | primary and secondary |
| Cov Turnov | 12.5 km | 20,000 | 18,596 | primary and secondary |
| Cov Jilemnice - Devro | 12.8 km | 28,852 | 18,998 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Semily report?
Reported size: 13,333 h-e design capacity. Received load: 7,989 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Semily?
Aguas SB simulator reference scenario for 7,989 p.e. of reported load: 393,304 kWh per year (49.1 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.