Worldwide wastewater treatment observatory · Czechia

Aguas SB Observatory · public data to understand water

WWTP COV Stechovice - Trebenice

Czechia · official identifier CZ2105-763250-00241725-4/2U

450h-e design capacity (2022) · 602nd of 607

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ2105-763250-00241725-4/2U · reported size 450 h-e design capacity · received load 182 h-e · reported treatment: PS · data year 2022. 602nd of 607 records with reported size in the inventory of Czechia; < 0.01 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.3 km · 5 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

450h-e design capacity
182h-e received load (2022)
40 %reported load/capacity ratio (not hydraulic utilisation)
602nd of 607by reported size among the 607 records with a size in the inventory · < 0.01 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates49.8250, 14.4440 precision reported by the source: level 1 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Czechia

Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band under 1,000 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

17,083reference kWh per year for this load
94.2kWh per h-e (average load) per year
2,562€ per year at 0.15 €/kWh
49 %share of energy used for aeration

what this estimate is · Inputs: 182 p.e. of reported load; equivalent average load 181 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (43 m³/day of reference), not measured or available for reclamation.

LOCATION

Czechia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Stechovice3.3 km2,000840primary and secondary
Cov Stechovice - Masecin5.2 km550609primary and secondary
Cov Jilove U Prahy8.1 km6,5004,347primary and secondary
Cov Tynec Nad Sazavou - Chrast Nad Sazavou9.8 km800387primary and secondary
Cov Tynec Nad Sazavou10.0 km6,6007,726primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Stechovice - Trebenice report?

Reported size: 450 h-e design capacity. Received load: 182 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Stechovice - Trebenice?

Aguas SB simulator reference scenario for 182 p.e. of reported load: 17,083 kWh per year (94.2 kWh per p.e. of average load), with aeration as 49 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.