Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Tanvald
Czechia · official identifier CZ5108-778753-49099469-4/2U
9,037h-e design capacity (2022) · 222nd of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ5108-778753-49099469-4/2U · reported size 9,037 h-e design capacity · received load 8,203 h-e · reported treatment: PS · data year 2022. 222nd of 607 records with reported size in the inventory of Czechia; 0.06 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.2 km · 3 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 50.7325, 15.3142 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 8,203 p.e. of reported load; equivalent average load 8,231 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,952 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Velke Hamry | 2.2 km | 2,300 | 2,060 | primary and secondary |
| Cov Smrzovka | 4.3 km | 3,164 | 1,814 | primary and secondary |
| Cov Rokytnice Nad Jizerou | 7.7 km | 6,000 | 5,866 | primary and secondary |
| Vk Jablonec Nad Nisou - Kokonin | 10.2 km | not reported | not reported | not reported |
| Cov Zelezny Brod | 11.4 km | 7,566 | 2,707 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Tanvald report?
Reported size: 9,037 h-e design capacity. Received load: 8,203 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Tanvald?
Aguas SB simulator reference scenario for 8,203 p.e. of reported load: 403,241 kWh per year (49.0 kWh per p.e. of average load), with aeration as 46 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.