Worldwide wastewater treatment observatory · Czechia

Aguas SB Observatory · public data to understand water

WWTP COV Velke Brezno

Czechia · official identifier CZ4214-778681-00267139-4/1U

16,050h-e design capacity (2022) · 146th of 607

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ4214-778681-00267139-4/1U · reported size 16,050 h-e design capacity · received load 17,269 h-e · reported treatment: PS · data year 2022. 146th of 607 records with reported size in the inventory of Czechia; 0.11 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 1.9 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

16,050h-e design capacity
17,269h-e received load (2022)
108 %reported load/capacity ratio (not hydraulic utilisation)
146th of 607by reported size among the 607 records with a size in the inventory · 0.11 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates50.6652, 14.1336 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Czechia

Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

829,476reference kWh per year for this load
47.9kWh per h-e (average load) per year
124,421€ per year at 0.15 €/kWh
47 %share of energy used for aeration

what this estimate is · Inputs: 17,269 p.e. of reported load; equivalent average load 17,331 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

1.5estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (4,110 m³/day of reference), not measured or available for reclamation.

LOCATION

Czechia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Cov Usti Nad Labem - Nestemice1.9 km169,00065,270primary and secondary
Cov Decin - Boletice9.4 km68,00014,740primary and secondary
Cov Chlumec U Chabarovic13.6 km4,2671,944primary and secondary
Vk Decin14.3 kmnot reportednot reportednot reported
Cov Benesov Nad Ploucnici - Nova14.7 km4,0001,125primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP COV Velke Brezno report?

Reported size: 16,050 h-e design capacity. Received load: 17,269 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of COV Velke Brezno?

Aguas SB simulator reference scenario for 17,269 p.e. of reported load: 829,476 kWh per year (47.9 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.