WWTP COV Vnorovy
Czechia · official identifier CZ6218-784206-00285480-4/1U
3,217h-e design capacity (2022) · 470th of 607
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ6218-784206-00285480-4/1U · reported size 3,217 h-e design capacity · received load 1,032 h-e · reported treatment: PS · data year 2022. 470th of 607 records with reported size in the inventory of Czechia; 0.02 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.2 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 48.9277, 17.3400 precision reported by the source: level 0 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 1,032 p.e. of reported load; equivalent average load 1,037 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (246 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Veseli Nad Moravou | 3.2 km | 16,000 | 6,320 | primary and secondary |
| Cov Straznice | 4.7 km | 9,751 | 12,566 | primary and secondary |
| Cov Velicka | 4.7 km | 3,600 | 2,043 | primary, secondary and tertiary |
| Cov Bzenec | 5.8 km | 22,600 | 11,548 | primary and secondary |
| Cov Uhersky Ostroh | 6.6 km | 5,100 | 2,597 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Vnorovy report?
Reported size: 3,217 h-e design capacity. Received load: 1,032 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Vnorovy?
Aguas SB simulator reference scenario for 1,032 p.e. of reported load: 57,563 kWh per year (55.5 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.