Worldwide wastewater treatment observatory · Czechia
Aguas SB Observatory · public data to understand water
WWTP COV Votice
Czechia · official identifier CZ2126-785041-00232963-4/1U
5,500h-e design capacity (2022) · 322nd of 607 (tied with 6 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ2126-785041-00232963-4/1U · reported size 5,500 h-e design capacity · received load 4,932 h-e · reported treatment: PS · data year 2022. 322nd of 607 records with reported size in the inventory of Czechia (tied with 6 others); 0.04 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 9.5 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.6533, 14.6324 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Czechia
Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 4,932 p.e. of reported load; equivalent average load 4,950 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,174 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cov Bystrice U Benesova | 9.5 km | 4,950 | 3,443 | primary and secondary |
| Cov Sedlec-Prcice | 11.2 km | 2,500 | 1,725 | primary and secondary |
| Cov Sedlcany | 14.8 km | 23,000 | 8,342 | primary, secondary and tertiary |
| Cov Benesov | 15.6 km | 53,738 | 42,325 | primary and secondary |
| Cov Mlada Vozice | 18.1 km | 2,880 | 1,383 | primary and secondary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP COV Votice report?
Reported size: 5,500 h-e design capacity. Received load: 4,932 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of COV Votice?
Aguas SB simulator reference scenario for 4,932 p.e. of reported load: 245,629 kWh per year (49.6 kWh per p.e. of average load), with aeration as 71 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.