Worldwide wastewater treatment observatory · Czechia

Aguas SB Observatory · public data to understand water

WWTP UCOV Ostrava - Privoz

Czechia · official identifier CZ8119-713767-00845451-4/1U

638,850h-e design capacity (2022) · 4th of 607

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier CZ8119-713767-00845451-4/1U · reported size 638,850 h-e design capacity · received load 215,649 h-e · reported treatment: PS · data year 2022. 4th of 607 records with reported size in the inventory of Czechia; 4.3 % of the sum of those 607 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 9 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

638,850h-e design capacity
215,649h-e received load (2022)
34 %reported load/capacity ratio (not hydraulic utilisation)
4th of 607by reported size among the 607 records with a size in the inventory · 4.3 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates49.8555, 18.2453 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 2025-03-01 · The biological treatment stage at the central Ostrava-Přívoz plant resumed operation after refurbishment. City of Ostrava

Other published data

Mean annual volume treated reported in the 2022 cycle24,810,450 m³/year (2022) · source

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L02; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Czechia

Regulatory framework of Czechia · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

7,128,554reference kWh per year for this load
32.9kWh per h-e (average load) per year
1,069,283€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 215,649 p.e. of reported load; equivalent average load 216,416 p.e. with the reference profile of Czechia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

18.7estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (51,324 m³/day of reference), not measured or available for reclamation.

LOCATION

Czechia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Ucov Cez Ostrava - Vitkovice4.7 km10,000772primary and secondary
Cov Hlucin - Jasenky4.9 km14,6096,379primary and secondary
Vk Ostrava - Kuncice A Kuncicky5.6 kmnot reportednot reportednot reported
Vk Ostrava - Radvanice7.4 kmnot reportednot reportednot reported
Cov Ostrava - Michalkovice7.8 km5,280871primary and secondary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP UCOV Ostrava - Privoz report?

Reported size: 638,850 h-e design capacity. Received load: 215,649 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of UCOV Ostrava - Privoz?

Aguas SB simulator reference scenario for 215,649 p.e. of reported load: 7,128,554 kWh per year (32.9 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.