Worldwide wastewater treatment observatory · Denmark
Aguas SB Observatory · public data to understand water
WWTP Hedensted Renseanlæg
Denmark · official identifier DK6130041
45,000h-e design capacity (2022) · 67th of 321
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier DK6130041 · reported size 45,000 h-e design capacity · received load 21,449 h-e · reported treatment: PST · data year 2022. 67th of 321 records with reported size in the inventory of Denmark; 0.37 % of the sum of those 321 records in h-e (sum of records, not national capacity); nearest inventoried plant at 6.9 km · 1 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 55.7330, 9.7302 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Denmark
Regulatory framework of Denmark · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 21,449 p.e. of reported load; equivalent average load 20,968 p.e. with the reference profile of Denmark (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (6,692 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Brejning Centralrens. | 6.9 km | 19,600 | 7,589 | primary, secondary and tertiary |
| Gårslev Renseanlæg | 11.1 km | 3,600 | 277 | primary, secondary and tertiary |
| Vejle Centralrens. | 12.3 km | 170,000 | 99,352 | primary, secondary and tertiary |
| Horsens | 15.7 km | 210,000 | 117,329 | primary, secondary and tertiary |
| Juelsminde | 17.2 km | 22,000 | 7,590 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP Hedensted Renseanlæg report?
Reported size: 45,000 h-e design capacity. Received load: 21,449 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of Hedensted Renseanlæg?
Aguas SB simulator reference scenario for 21,449 p.e. of reported load: 1,104,687 kWh per year (52.7 kWh per p.e. of average load), with aeration as 47 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.