Worldwide wastewater treatment observatory · Estonia

Aguas SB Observatory · public data to understand water

WWTP Pärnu Mõrra reoveepuhastusjaam

Estonia · official identifier EEPUH6250020

125,000h-e design capacity (2022) · 5th of 45

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EEPUH6250020 · reported size 125,000 h-e design capacity · received load 99,529 h-e · reported treatment: PST · data year 2022. 5th of 45 records with reported size in the inventory of Estonia; 6.9 % of the sum of those 45 records in h-e (sum of records, not national capacity); nearest inventoried plant at 38.7 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

125,000h-e design capacity
99,529h-e received load (2022)
80 %reported load/capacity ratio (not hydraulic utilisation)
5th of 45by reported size among the 45 records with a size in the inventory · 6.9 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates58.3872, 24.4522 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1980 · The municipal wastewater plan records 1980 as the construction year of Mõrra wastewater treatment plant in Pärnu. City of Pärnu

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Estonia

Regulatory framework of Estonia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

3,256,771reference kWh per year for this load
32.7kWh per h-e (average load) per year
488,516€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 99,529 p.e. of reported load; equivalent average load 99,561 p.e. with the reference profile of Estonia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

6.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (17,019 m³/day of reference), not measured or available for reclamation.

LOCATION

Estonia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Kilingi-Nõmme Linna Puhasti38.7 km2,100775primary, secondary and tertiary
Vändra Alevi Reoveepuhasti43.8 km4,3331,503primary, secondary and tertiary
Märjamaa57.3 km4,4003,413primary, secondary and tertiary
Viljandi Reoveepuhasti, Kösti68.6 km25,00021,514primary, secondary and tertiary
Rapla70.4 km13,0004,890primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Pärnu Mõrra reoveepuhastusjaam report?

Reported size: 125,000 h-e design capacity. Received load: 99,529 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Pärnu Mõrra reoveepuhastusjaam?

Aguas SB simulator reference scenario for 99,529 p.e. of reported load: 3,256,771 kWh per year (32.7 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.