Worldwide wastewater treatment observatory · Estonia

Aguas SB Observatory · public data to understand water

WWTP Tapa linna reoveepuhasti

Estonia · official identifier EEPUH0592910

8,300h-e design capacity (2022) · 24th of 45

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EEPUH0592910 · reported size 8,300 h-e design capacity · received load 9,648 h-e · reported treatment: PST · data year 2022. 24th of 45 records with reported size in the inventory of Estonia; 0.46 % of the sum of those 45 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.3 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

8,300h-e design capacity
9,648h-e received load (2022)
116 %reported load/capacity ratio (not hydraulic utilisation)
24th of 45by reported size among the 45 records with a size in the inventory · 0.46 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates59.2752, 25.9543 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Estonia

Regulatory framework of Estonia · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

406,281reference kWh per year for this load
42.1kWh per h-e (average load) per year
60,942€ per year at 0.15 €/kWh
51 %share of energy used for aeration

what this estimate is · Inputs: 9,648 p.e. of reported load; equivalent average load 9,653 p.e. with the reference profile of Estonia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

0.6estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (1,650 m³/day of reference), not measured or available for reclamation.

LOCATION

Estonia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Kadrina12.3 km4,0002,889primary, secondary and tertiary
Tamsalu Reoveepuhasti15.0 km3,0662,343primary, secondary and tertiary
Väike-Maarja Reoveepuhasti22.8 km3,2222,156primary, secondary and tertiary
Rakvere Linna Reoveepuhasti24.5 km166,67024,794primary, secondary and tertiary
Haljala25.0 km22,038733primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Tapa linna reoveepuhasti report?

Reported size: 8,300 h-e design capacity. Received load: 9,648 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Tapa linna reoveepuhasti?

Aguas SB simulator reference scenario for 9,648 p.e. of reported load: 406,281 kWh per year (42.1 kWh per p.e. of average load), with aeration as 51 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.