Worldwide wastewater treatment observatory · Estonia

Aguas SB Observatory · public data to understand water

WWTP Tartu RVP

Estonia · official identifier EEPUH7950010

120,000h-e design capacity (2022) · 6th of 45

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier EEPUH7950010 · reported size 120,000 h-e design capacity · received load 254,452 h-e · reported treatment: PST · data year 2022. 6th of 45 records with reported size in the inventory of Estonia; 6.6 % of the sum of those 45 records in h-e (sum of records, not national capacity); nearest inventoried plant at 24.0 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

120,000h-e design capacity
254,452h-e received load (2022)
212 %reported load/capacity ratio (not hydraulic utilisation)
6th of 45by reported size among the 45 records with a size in the inventory · 6.6 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalyes
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates58.3402, 26.7364 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

  • 1998 · Biological treatment at Tartu wastewater treatment plant came into operation in 1998. City of Tartu

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L07; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: Estonia

Regulatory framework of Estonia · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

7,352,204reference kWh per year for this load
28.9kWh per h-e (average load) per year
1,102,831€ per year at 0.15 €/kWh
63 %share of energy used for aeration

what this estimate is · Inputs: 254,452 p.e. of reported load; equivalent average load 254,539 p.e. with the reference profile of Estonia (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

15.9estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (43,511 m³/day of reference), not measured or available for reclamation.

LOCATION

Estonia: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Elva Reoveepuhasti24.0 km11,1103,940primary, secondary and tertiary
Otepää33.5 km5,8001,550primary, secondary and tertiary
Põlva35.9 km36,00022,388primary, secondary and tertiary
Jõgeva Linna Reoveepuhasti48.4 km8,2009,333primary, secondary and tertiary
Räpina51.2 km3,3001,733primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP Tartu RVP report?

Reported size: 120,000 h-e design capacity. Received load: 254,452 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of Tartu RVP?

Aguas SB simulator reference scenario for 254,452 p.e. of reported load: 7,352,204 kWh per year (28.9 kWh per p.e. of average load), with aeration as 63 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.