Worldwide wastewater treatment observatory · Finland
Aguas SB Observatory · public data to understand water
WWTP TP (337) of Kuhmon kt.
Finland · official identifier FIJVP_O000000000337
7,500h-e design capacity (2022) · 105th of 145 (tied with 1 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FIJVP_O000000000337 · reported size 7,500 h-e design capacity · received load 7,500 h-e · reported treatment: PST · data year 2022. 105th of 145 records with reported size in the inventory of Finland (tied with 1 others); 0.10 % of the sum of those 145 records in h-e (sum of records, not national capacity); nearest inventoried plant at 57.5 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 64.1239, 29.5014 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Finland
Regulatory framework of Finland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,500 p.e. of reported load; equivalent average load 7,506 p.e. with the reference profile of Finland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,313 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Tp (798) Of Vuokatti | 57.5 km | 24,000 | 11,700 | primary, secondary and tertiary |
| Tp (558) Of Nurmeksen Kt. | 67.7 km | 7,100 | 7,600 | primary, secondary and tertiary |
| Tp (811) Of Suomussalmi | 88.5 km | 11,000 | 9,000 | primary, secondary and tertiary |
| Tp (208) Of Kajaanin Kt. | 89.5 km | 35,000 | 35,900 | primary, secondary and tertiary |
| Tp (426) Of Lieksan Kt. | 94.1 km | 17,200 | 9,100 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TP (337) of Kuhmon kt. report?
Reported size: 7,500 h-e design capacity. Received load: 7,500 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of TP (337) of Kuhmon kt.?
Aguas SB simulator reference scenario for 7,500 p.e. of reported load: 322,474 kWh per year (43.0 kWh per p.e. of average load), with aeration as 50 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.