Worldwide wastewater treatment observatory · Finland

Aguas SB Observatory · public data to understand water

WWTP TP (608) of Pieksamaen kt.

Finland · official identifier FIJVP_O000000000608

18,000h-e design capacity (2022) · 64th of 145 (tied with 1 others)

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FIJVP_O000000000608 · reported size 18,000 h-e design capacity · received load 34,000 h-e · reported treatment: PST · data year 2022. 64th of 145 records with reported size in the inventory of Finland (tied with 1 others); 0.25 % of the sum of those 145 records in h-e (sum of records, not national capacity); nearest inventoried plant at 42.2 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

18,000h-e design capacity
34,000h-e received load (2022)
189 %reported load/capacity ratio (not hydraulic utilisation)
64th of 145by reported size among the 145 records with a size in the inventory (tied with 1 others) · 0.25 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels
Nitrogen removalnot reported
Phosphorus removalyes
UV disinfectionnot reported
Statusactive
Reported coordinates62.2937, 27.1131 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

REGULATORY REFERENCES

Referencia normativa: Finland

Regulatory framework of Finland · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

1,387,785reference kWh per year for this load
40.8kWh per h-e (average load) per year
208,168€ per year at 0.15 €/kWh
58 %share of energy used for aeration

what this estimate is · Inputs: 34,000 p.e. of reported load; equivalent average load 34,014 p.e. with the reference profile of Finland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

2.2estimated hm³ of treated water per year
tertiary treatment reporteda starting point for reclamation

what this estimate is · Volume estimated from the reported load (5,950 m³/day of reference), not measured or available for reclamation.

LOCATION

Finland: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Tp (217) Of Kangasniemen Kk.42.2 km3,8004,200primary, secondary and tertiary
Tp (600000203) Of Varkauden Kt.42.5 km32,00037,500primary, secondary and tertiary
Tp (1900023156) Of Suonenjoen Kt.44.9 km37,00033,800primary, secondary and tertiary
Tp (187) Of Juvan Kk.57.8 km5,0004,400primary, secondary and tertiary
Tp (1901006593) Of Mikkelin Kt.69.3 km64,00060,300primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP TP (608) of Pieksamaen kt. report?

Reported size: 18,000 h-e design capacity. Received load: 34,000 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of TP (608) of Pieksamaen kt.?

Aguas SB simulator reference scenario for 34,000 p.e. of reported load: 1,387,785 kWh per year (40.8 kWh per p.e. of average load), with aeration as 58 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.