Worldwide wastewater treatment observatory · Finland
Aguas SB Observatory · public data to understand water
WWTP TP (670) of Pyhasalmi
Finland · official identifier FIJVP_O000000000670
5,000h-e design capacity (2022) · 128th of 145 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FIJVP_O000000000670 · reported size 5,000 h-e design capacity · received load 3,900 h-e · reported treatment: PST · data year 2022. 128th of 145 records with reported size in the inventory of Finland (tied with 3 others); 0.07 % of the sum of those 145 records in h-e (sum of records, not national capacity); nearest inventoried plant at 30.0 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 63.6745, 26.0163 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: Finland
Regulatory framework of Finland · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 3,900 p.e. of reported load; equivalent average load 3,904 p.e. with the reference profile of Finland (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (683 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Tp (297) Of Kiuruveden Kt. | 30.0 km | 7,100 | 5,600 | primary, secondary and tertiary |
| Tp (545) Of Nivalan Kt. | 60.0 km | 17,900 | 14,000 | primary, secondary and tertiary |
| Tp (130) Of Iisalmen Kt. | 60.2 km | 72,900 | 75,000 | primary, secondary and tertiary |
| Tp (52) Of Haapaveden Kt. | 61.6 km | 63,000 | 58,000 | primary, secondary and tertiary |
| Tp (953) Of Viitasaaren Kt. | 65.2 km | 4,600 | 3,700 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP TP (670) of Pyhasalmi report?
Reported size: 5,000 h-e design capacity. Received load: 3,900 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of TP (670) of Pyhasalmi?
Aguas SB simulator reference scenario for 3,900 p.e. of reported load: 180,271 kWh per year (46.2 kWh per p.e. of average load), with aeration as 73 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.