Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP ALES
France · official identifier FR060930259003
90,000h-e design capacity (2022) · 171st of 4,051 (tied with 3 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060930259003 · reported size 90,000 h-e design capacity · received load 63,750 h-e · reported treatment: PST · data year 2022. 171st of 4,051 records with reported size in the inventory of France (tied with 3 others); 0.09 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.1 km · 4 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | yes |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 44.0848, 4.1082 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 63,750 p.e. of reported load; equivalent average load 63,784 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (9,244 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Saint-Christol- Lez-Ales | 3.1 km | 8,500 | 47,237 | primary, secondary and tertiary |
| Saint-Privat-des-Vieux | 6.9 km | 3,000 | 4,681 | primary and secondary |
| Cendras L'Abbaye | 8.6 km | 2,000 | 1,873 | primary, secondary and tertiary |
| Salindres | 9.6 km | 5,000 | 3,416 | primary, secondary and tertiary |
| Anduze | 10.6 km | 9,000 | 5,575 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP ALES report?
Reported size: 90,000 h-e design capacity. Received load: 63,750 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of ALES?
Aguas SB simulator reference scenario for 63,750 p.e. of reported load: 2,191,547 kWh per year (34.4 kWh per p.e. of average load), with aeration as 60 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.