Worldwide wastewater treatment observatory · France

Aguas SB Observatory · public data to understand water

WWTP AVIGNON - LE PONTET

France · official identifier FR060984007001

177,166h-e design capacity (2022) · 71st of 4,051

European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060984007001 · reported size 177,166 h-e design capacity · received load 196,046 h-e · reported treatment: PS · data year 2022. 71st of 4,051 records with reported size in the inventory of France; 0.18 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 3.0 km · 10 within 10 km. Reported data with their source; estimates are not measurements of the plant.

Aguas SB does not manage this wastewater treatment plant.

WHAT THE DATA REPORT

Reported data official data · 2022

177,166h-e design capacity
196,046h-e received load (2022)
111 %reported load/capacity ratio (not hydraulic utilisation)
71st of 4,051by reported size among the 4,051 records with a size in the inventory · 0.18 % of the sum of those records (sum of records, not national capacity) · the largest plants in the country · how it is calculated
Treatmentprimary + secondary (as reported to the EEA: PS) · reported levels
Nitrogen removalnot reported
Phosphorus removalnot reported
UV disinfectionnot reported
Statusactive
Reported coordinates43.9380, 4.7862 precision reported by the source: level 2 what it means
Source and yearEuropean Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record

FUENTES PÚBLICAS

What public sources report

Documented milestones

Facts taken from public documents, with their date and link; an authorisation, a project or a planned capacity do not prove operation or quantities actually treated. Aguas SB editorial layer, lot L05; it does not change the official data.

REGULATORY REFERENCES

Referencia normativa: France

Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 150,000 p.e. or more; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.

SCENARIO

Reference energy scenario for this load estimate · simulator engine

5,562,676reference kWh per year for this load
28.4kWh per h-e (average load) per year
834,401€ per year at 0.15 €/kWh
64 %share of energy used for aeration

what this estimate is · Inputs: 196,046 p.e. of reported load; equivalent average load 196,146 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.

Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.

WATER THAT COULD RETURN

Reuse potential

10.4estimated hm³ of treated water per year
tertiary treatment not reportedreclamation requires additional treatment

what this estimate is · Volume estimated from the reported load (28,427 m³/day of reference), not measured or available for reclamation.

LOCATION

France: this plant on the map

this plant on the map · regional directory.

NEARBY PLANTS

Nearby wastewater treatment plants

PlantDistanceCapacity (h-e)Load 2022Treatment
Rognonas3.0 km8,4004,950primary and secondary
Barbentane5.4 km5,0003,632primary, secondary and tertiary
Châteaurenard Ville5.7 km17,00019,829primary, secondary and tertiary
Pujaut6.6 km4,0002,791primary and secondary
Rochefort-Du-Gard6.9 km7,0005,044primary, secondary and tertiary

Distances are between reported coordinates; proximity does not establish a hydraulic connection.

QUESTIONS

Frequently asked questions about this plant

What capacity does WWTP AVIGNON - LE PONTET report?

Reported size: 177,166 h-e design capacity. Received load: 196,046 h-e. Units are retained without conversion.

What treatment is reported?

Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.

How much energy would a reference plant use with the load of AVIGNON - LE PONTET?

Aguas SB simulator reference scenario for 196,046 p.e. of reported load: 5,562,676 kWh per year (28.4 kWh per p.e. of average load), with aeration as 64 % of consumption. Estimate with the country reference profile; not a measurement of the plant.

SOURCE AND CORRECTIONS

Source

reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.