WWTP AY SUR MOSELLE
France · official identifier FR025704300120
19,300h-e design capacity (2022) · 818th of 4,051
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR025704300120 · reported size 19,300 h-e design capacity · received load 7,028 h-e · reported treatment: PST · data year 2022. 818th of 4,051 records with reported size in the inventory of France; 0.02 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 2.0 km · 6 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 49.2402, 6.2011 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 7,028 p.e. of reported load; equivalent average load 7,031 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (1,019 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Talange | 2.0 km | 55,700 | 27,619 | primary, secondary and tertiary |
| Maizieres-les-Metz | 4.0 km | 19,500 | 22,680 | primary, secondary and tertiary |
| Vallee de L'Orne | 4.4 km | 70,000 | 53,431 | primary, secondary and tertiary |
| Argancy | 4.5 km | 3,400 | 4,495 | primary, secondary and tertiary |
| Guenange | 6.8 km | 19,000 | 23,145 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP AY SUR MOSELLE report?
Reported size: 19,300 h-e design capacity. Received load: 7,028 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of AY SUR MOSELLE?
Aguas SB simulator reference scenario for 7,028 p.e. of reported load: 286,186 kWh per year (40.7 kWh per p.e. of average load), with aeration as 53 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.