Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP BIEF-DU-FOURG
France · official identifier FR060939053001
2,500h-e design capacity (2022) · 3458th of 4,051 (tied with 161 others)
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060939053001 · reported size 2,500 h-e design capacity · received load 2,100 h-e · reported treatment: PS · data year 2022. 3458th of 4,051 records with reported size in the inventory of France (tied with 161 others); < 0.01 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 12.1 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary (as reported to the EEA: PS) · reported levels |
|---|---|
| Nitrogen removal | not reported |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | active |
| Reported coordinates | 46.8098, 6.1029 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 1,000 to 9,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
SCENARIO
Reference energy scenario for this load estimate · simulator engine
what this estimate is · Inputs: 2,100 p.e. of reported load; equivalent average load 2,105 p.e. with the reference profile of France (hypothesis with reported load and reference profile; not a measurement). Open this scenario in the simulator · how it is calculated and what it is not.
Reference scenario computed on the server from the reported load and the country profile; an estimate, not a measurement. The simulator recomputes it when opened.
WATER THAT COULD RETURN
Reuse potential
what this estimate is · Volume estimated from the reported load (305 m³/day of reference), not measured or available for reclamation.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| La Riviere Drugeon | 12.1 km | 6,300 | 6,014 | primary, secondary and tertiary |
| Mouthe | 13.7 km | 3,500 | 5,710 | primary, secondary and tertiary |
| Levier | 15.6 km | 3,150 | 3,513 | primary, secondary and tertiary |
| Longevilles-Mont-D'Or | 16.6 km | 4,150 | 4,431 | primary, secondary and tertiary |
| Champagnole | 17.5 km | 22,167 | 7,566 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP BIEF-DU-FOURG report?
Reported size: 2,500 h-e design capacity. Received load: 2,100 h-e. Units are retained without conversion.
What treatment is reported?
Treatment PS. Nitrogen, phosphorus and UV are shown only when explicitly reported.
How much energy would a reference plant use with the load of BIEF-DU-FOURG?
Aguas SB simulator reference scenario for 2,100 p.e. of reported load: 98,392 kWh per year (46.8 kWh per p.e. of average load), with aeration as 72 % of consumption. Estimate with the country reference profile; not a measurement of the plant.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.