Worldwide wastewater treatment observatory · France
Aguas SB Observatory · public data to understand water
WWTP CAGNES-SUR-MER
France · official identifier FR060906027001
130,000h-e design capacity (2022) · 104th of 4,051 (tied with 5 others)
Facility inactive according to reported data. Historical profile: excluded from current aggregates.
European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · official identifier FR060906027001 · reported size 130,000 h-e design capacity · reported treatment: PST · data year 2022. 104th of 4,051 records with reported size in the inventory of France (tied with 5 others); 0.13 % of the sum of those 4,051 records in h-e (sum of records, not national capacity); nearest inventoried plant at 0.8 km · 7 within 10 km. Reported data with their source; estimates are not measurements of the plant.
Aguas SB does not manage this wastewater treatment plant.
WHAT THE DATA REPORT
Reported data official data · 2022
| Treatment | primary + secondary + tertiary (more stringent) (as reported to the EEA: PST) · reported levels |
|---|---|
| Nitrogen removal | yes |
| Phosphorus removal | not reported |
| UV disinfection | not reported |
| Status | inactive according to reported data |
| Reported coordinates | 43.6538, 7.1548 precision reported by the source: level 2 what it means |
| Source and year | European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · dataset record |
REGULATORY REFERENCES
Referencia normativa: France
Regulatory framework of France · Directive (EU) 2024/3019: reported-capacity band 10,000 to 149,999 p.e.; obligations are set by agglomeration load, not by the capacity of this plant. Individual applicability is not determined in this profile.
NEARBY PLANTS
Nearby wastewater treatment plants
| Plant | Distance | Capacity (h-e) | Load 2022 | Treatment |
|---|---|---|---|---|
| Cagnes-Sur-Mer 2 | 0.8 km | 130,000 | 84,507 | primary, secondary and tertiary |
| Sant-Laurent Du Var | 3.5 km | 110,000 | 62,728 | primary, secondary and tertiary |
| Nice-Haliotis | 6.5 km | 623,333 | 513,877 | primary, secondary and tertiary |
| Vence-Malvan 2 | 6.7 km | 28,000 | 13,457 | primary, secondary and tertiary |
| La Gaude Tuilieres | 7.3 km | 5,000 | 1,593 | primary, secondary and tertiary |
Distances are between reported coordinates; proximity does not establish a hydraulic connection.
QUESTIONS
Frequently asked questions about this plant
What capacity does WWTP CAGNES-SUR-MER report?
Reported size: 130,000 h-e design capacity. Units are retained without conversion.
What treatment is reported?
Treatment PST. Nitrogen, phosphorus and UV are shown only when explicitly reported.
SOURCE AND CORRECTIONS
Source
reported data · European Environment Agency — Waterbase-UWWTD, data call 2023 (versión final pública) · data 2022 · edition 2023 · source licence: CC BY 4.0 · JSON for this plant · suggest a correction · catalogue 2026-11-06. Reported data, not a current inspection; no compliance judgements.